A bathroom refit has two plumbing stages, and most of the trouble in a refit happens in the gap between them.
First fix
First fix is everything that goes in before the walls and floor are finished: the new supply pipes, the waste pipes, the fixings and the positions for every tap, toilet and shower. Once the walls are boarded and tiled, these are set in stone.
Second fix
Second fix is everything that goes on after the tiling: the basin and taps, the toilet, the shower valve and head, the towel rail, the vanity unit. It is the part you see.
Why one team for both
If one plumber does the first fix and another does the second, the second one inherits every decision the first one made, including the mistakes. A waste pipe a few centimetres out, a supply in the wrong place for the tap you chose, a shower valve set too deep in the wall. With the first fix and second fix done by the same people, the person putting the basin on is the person who put the pipes in for it.
Decide before the old suite comes out
- The exact products. Taps, shower valve, toilet and basin, because pipe positions depend on them.
- Where everything goes. Moving a toilet means moving the soil pipe, which is the biggest constraint in most bathrooms.
- Heating. A towel rail on the heating, an electric one, or both. Underfloor heating has to go in before the floor is laid, tested and commissioned before anything covers it.
Older Porthcawl houses
In the older cottages in Nottage and around the old parts of Porthcawl, walls and floors are rarely square and pipe runs can be surprising. We look at what is there before promising where anything can go, so the price you agree is one that holds.
How it runs
Tell us the size of the room, what you have now and what you want. Send a few photos. We price the plumbing before we start, and all of it carries our 1 year warranty. If you want smaller jobs instead, like a new vanity unit or a towel rail, we do those too.